Lawrence Berkeley Laboratory Physics Division Cosmic Background Explorer (COBE) records of George Smoot,
1975-1995
Repository
Lawrence Berkeley National Laboratory, Archives and Records Office
1 Cyclotron Rd. MS: 69R0102
Berkeley, California 94720
USA
https://commons.lbl.gov/display/aro/Archives+and+Records
aro@lbl.gov
Papers created by
Lawrence Berkeley Laboratory. Physics Division
Size of collection
27.5 linear feet
22 records boxes
Short description of collection
This collection contains the project case files of George Smoot who worked on the Cosmic Background Explorer (COBE), for which Smoot won the nobel prize for physics in 2006.
Language(s) of collection
English
Collection number:
ARO-5302
The laboratory was founded as the University of California Radiation Laboratory in 1931 by Ernest Orlando Lawrence, a University of California Berkeley physicist who won the 1939 Nobel Prize in physics for his invention of the cyclotron, a circular particle accelerator that opened the door to high-energy physics. It is a United States Department of Energy National Laboratory, operated by the University of California. The name changed to Lawrence Berkeley National Laboratory in 1995.
Astrophysicist and cosmologist George Smoot (Ph.D., MIT, 1970) worked as professor at the University of California Berkeley, and cosmologist and astrophysicsist at Lawrence Berkeley National Laboratory (1970- ). In 2006, Smoot co-received the Nobel Prize for Physics along with John Mather for discoveries in cosmic microwave background radiation.
This collection contains the project case files of George Smoot who worked on the Cosmic Background Explorer (COBE), for which Smoot won the nobel prize for physics in 2006. Smoot was the principal investigator for the COBE Differential Microwave Radiometers (DMR) group, which found the anisotropies in the cosmic microwave background that eventually grow to galaxies and clusters of galaxies. The collection includes COBE memos, letters, some data, budget plans, design proposals, reviews, instrument requirements, and progress reports.
See also: LBL Physics Division scientific papers of George Smoot, 1975-2007 (ARO-5813); LBL Physics Division oversize scientific files of George Smoot, 1989 (ARO-5998); LBL Physics Division technical documents of George Smoot, 1980-1995 (ARO-6017).
This collection requires permission for access. Please contact the repository for more information, via email at aro@lbl.gov.
These papers have been indexed in the
International Catalog of Sources for History of Physics and Allied Sciences (ICOS)
using the following terms. Those seeking related materials should search under these terms.
Persons
Smoot, George
Institutions
Cosmic Background Explorer (Satellite)
Lawrence Berkeley Laboratory
Lawrence Berkeley Laboratory. Physics Division
Lawrence Berkeley National Laboratory
Lawrence Radiation Laboratory
Subject terms
Astrophysics.
Cosmic radiation background.
Cosmology.
Physics. Administration.
Lawrence Berkeley Laboratory Physics Division technical documents of George Smoot, 1980-1995 (2 records boxes). Filing code: ARO-6017. Finding aid
Lawrence Berkeley Laboratory Physics Division scientific papers of George Smoot, 1975-1997 (36 records boxes). Filing code: ARO-5813. Finding aid
Lawrence Berkeley Laboratory Physics Division oversize scientific files of George Smoot, 1989 (1 records box). Filing code: ARO-5998. Finding aid
Title
Finding Aid to the Lawrence Berkeley Laboratory Physics Division Cosmic Background Explorer (COBE) records of George Smoot, 1975-1995
Publisher
American Institute of Physics Niels Bohr Library & Archives
One Physics Ellipse
College Park, MD 20740
USA
nbl@aip.org
2012
Encoding Information
Machine-readable finding aid encoded by Melanie J. Mueller in 2012. Any revisions made to this finding aid occurred as part of the editing and encoding process.
Box 1 |
Folder 1 |
Observational Cosmology: A Measurement of the Low Frequency Portion of the Spectrum of the Cosmic Microwave Background Radiation Volumes 1-2, |
|
Folder 4 |
VLA Observer's Information Sheet - Kogut, A. |
|
Folder 5 |
Thermal Emission from Ionized Hydrogen, 1977 |
|
Folder 6 |
Formaldehyde Absorption Toward W51 - A. Kogut, G.F. Smoot |
|
Folder 7 |
DMR Group Emails |
|
Folder 8 |
[Things to Take to White Mountain - Checklists] |
|
Folder 11 |
VLA Observational Status Report, 1986 |
|
Folder 12 |
[White Mountain] |
|
Folder 14 |
Bolometer and Calibration - Al Kogut |
|
Folder 15 |
Microfabrication Laboratory EECS / ERL |
|
Folder 16 |
DMR User Guides |
|
Folder 17 |
CSDR Mission Planning Displays Facility, September 16, 1986 |
|
Folder 18 |
Astrophysics Data Operations, April 15, 1986 |
|
Folder 19 |
COBE Science Data (CSDR) System Concept Design Document September, 1985 |
|
Folder 20 |
COBE System Concept Review Vol. II DIRBE and DMR Instruments, July 27, 1982 |
|
Folder 21 |
COBE System Concept Review Vol. III Observatory Subsystems, July 28, 1982 |
|
Folder 22 |
COBE System Concept Review Vol. IV Test/Operations and Data System, July 29, 1982 |
|
Folder 23 |
Critical Design Review for the COBE Science Data Room (CSDR) Day One, Morning, March 26, 1987 |
|
Folder 24 |
Critical Design Review for the COBE Science Data Room (CSDR) Day One, Afternoon, March 26, 1987 |
|
Folder 25 |
Critical Design Review for the COBE Science Data Room (CSDR) Day Two, March 27, 1987 |
|
Folder 26 |
COBE Transition Status Review CSDR, December 10, 1990 |
|
Folder 27 |
COBE Instrument Technical Status Review Day 1 Morning General Topics, July 20-23, 1987 |
|
Folder 28 |
COBE Instrument Technical Status Review, Day 1 Afternoon DIRBE, July 20-23, 1987 |
|
Folder 29 |
COBE Instrument Technical Status Review, Day 2 DIRBE, July 20-23, 1987 |
|
Folder 30 |
COBE Instrument Technical Status Review, Day 3 Morning FIRAS, July 20-23, 1987 |
Box 2 |
Folder 1 |
COBE Instrument Technical Status Review, Day 3, Afternoon FIRAS, July 20-23, 1987 |
|
Folder 2 |
COBE Instrument Technical Status Review, Day 4 DMR, July 20-23, 1987 |
|
Folder 3 |
DMR CDR Detailed Documentation |
|
Folder 4 |
Cosmic Background Explorer (COBE) L&EO All-Hands Briefing, November 17, 1989 |
|
Folder 5 |
Technical Status Review COBE DMR, September 15, 1986 |
|
Folder 6 |
Performance Specification, Program, Requirements, and Design Guidelines for the Diffuse Infrared Background Experiment (DIRBE) for the Cosmic Background Explorer (COBE), December 1982 |
|
Folder 7 |
COBE Project CSDR Facility and Project-Controlled Software Requirements COBE-SR-730-1502-04 Revision 2, November 24, 1987 |
|
Folder 9 |
Guidelines for Preparing an Experiment Requirements Document (ERD) for COBE Instruments, March 8, 1982 |
|
Folder 10 |
COBE Observatory Structural, Power, Telemetry Thermal and Mission Phase Power Status Sumamries Rev. B and Rev. D, 1984-1985 |
|
Folder 11 |
COBE Delta Preliminary Interface Meeting, September 25, 1986 |
|
Folder 12 |
Data Submittal for Phase 0 Safety Review by Space Transportation System launch / Landing Site Operator for Cosmic Background Explorer, December 1983 |
|
Folder 13 |
Data Submittal for Safety Review by Space Transportation System Flight Operator for Cosmic Background Explorer Payload (Phase I) and Delwar Subsystem (Phase II), May 1984 |
|
Folder 14 |
Engineering Drawings DIRBE/FIRAS |
|
Folder 15 |
COBE Radiation Environment |
|
Folder 16 |
Interim Study Report for Cosmic Background Explorer, February 1, 1977 |
|
Folder 17 |
Interim Study Report for Cosmic Background Explorer Appendixes, February 1, 1977 |
|
Folder 18 |
Instrument Definition Report - Design Studies for a Far Infrared Absolute Spectrometer for the Cosmic Background Explorer, January 1980 |
|
Folder 19 |
90 GHz Anisotropy Log I Copy |
|
Folder 20 |
90 GHz Anisotropy Log II Copy |
Box 3 |
Folder 1 |
90 GHz III |
|
Folder 2 |
Verification Plan and Specification for Cosmic Background Explorer (COBE), December 1987 |
|
Folder 3 |
DIRBE Specifications |
|
Folder 5 |
Space and Earth Sciences Systems and Scientific Data Analysis Support Monthly Report, July 1990 |
|
Folder 6 |
Applied Engineering Software Systems Development and Analysis Support Monthly Report |
|
Folder 7 |
On Orbit Engineering Performance COBE Vol. 1 GSFC, March 7-8, 1990 |
|
Folder 8 |
On Orbit Engineering Performance COBE Vol. II GSFC, March 7-8, 1990 |
|
Folder 9 |
COBE Observatory TV/TB/Mission Operations Test - Thermal Subsystem |
|
Folder 10 |
Comic Background Explorer (COBE) Launch and Early Orbit Operations ICP, TAS, and Timeline Review, Voice Plan, Launch and Early Orbit Timeline, August 24, 1989 |
|
Folder 11 |
CSDR Programmer's Manual COBETRIEVE Volume / Cosmic Background Explorer (COBE), COBE Science Data Room (CSDR) |
|
Folder 12 |
DMR Test Script for 53 GHz Calibration and Offset Measurement Test, January 24, 1989 |
|
Folder 13 |
DMR Systematic Error Review, September 19, 1990 |
|
Folder 14 |
Cosmic Background Explorer (COBE) Launch and Early Orbit Operations Handbook, November 1989 |
|
Folder 15 |
DMR Test Scripts |
|
Folder 17 |
Technical Status Review COBE/FIRAS, September 15, 1986 |
Box 4 |
Folder 1 |
Technical Status Review COBE Instruments, September 15, 1986 |
|
Folder 2 |
COBE Instrument Technical Status Review, Day 2 DIRBE, July 20-23, 1987 |
|
Folder 3 |
COBE Instrument Technical Status Review, Day 3, Morning FIRAS, July 20-23, 1987 |
|
Folder 4 |
COBE Instrument Technical Status Review, Day 4 DMR, July 20-23, 1987 |
|
Folder 5 |
Reference Horn and Internal Calibrator (ICAL) Assembly |
|
Folder 6 |
Thermal Vacuum Bakeout of the COBE Flight Harness |
|
Folder 7 |
COBE DMR Notebook - Jon Aymon, 1989 |
|
Folder 8 |
STX COBE Project Audit Results, August 16, 1991 |
|
Folder 9 |
COBE Program Performance Verification Matrix, November 1989 |
|
Folder 10 |
DIRBE - Status Report |
|
Folder 11 |
DMR Status Report |
|
Folder 12 |
COBE Transition Review - FIRAS Instrument and Project Science, December 10, 1990 |
|
Folder 14 |
COBE L&EO Operations: A Recap and Final Operations Report, November 28, 1989 |
|
Folder 15 |
Approved Integrated Checkout Plan, Version 4 |
|
Folder 16 |
External Calibrator Mechanism Assembly, June 1988 |
|
Folder 17 |
Voice Plan Revision 2 |
|
Folder 18 |
Vibration Test Plan for COBE/FIRAS External Calibrator and Mechanism Protoflight Unit (PFU) in the 34 inch LN2 Dewar |
|
Folder 19 |
COBE CCB Meeting Agenda for Meeting, September 21, 1989 |
|
Folder 20 |
COBE Transition Status Review CSDR, December 10, 1990 |
|
Folder 21 |
COBE Thermal Subsystem Overview / R.A. Chambers, September 7, 1989 |
|
Folder 22 |
COBE Bi-Annual NASA Headquarters Review Differential Microwave Radiometers (DMR), September 7, 1989 |
|
Folder 23 |
COBE Mission Overview - D. McCarthy, September 7, 1989 |
|
Folder 24 |
COBE Instruments Pre-Integration Review FIRAS, September 1, 1988 |
|
Folder 25 |
COBE Instruments Pre-Integration Review DIRBE, September 2, 1988 |
|
Folder 26 |
Pipeline Overview, June 26, 1990 |
|
Folder 27 |
DMR Launch and Early Operations Report, December 7, 1989 |
|
Folder 28 |
COBE Project Office Transition Review, December 10, 1990 |
|
Folder 29 |
COBE Transition Review / Command Management Facility Spacecraft Control Programs Branch Code 514 / BENDIX, December 10, 1990 |
|
Folder 30 |
COBE Transition Review FDF Support, December 10, 1990 |
|
Folder 31 |
COBE Flight Operations Review CSDR Operations Readiness, September 25-27, 1989 |
|
Folder 32 |
COBE CSDR Operations and Maintenance Support Plan Vol. 1 Draft, September 8, 1989 |
|
Folder 33 |
GSFC Specification Far Infrared Absolute Spectrophometer (FIRAS), November 1979 |
|
Folder 34 |
Muller Blueprints and Design Documents - Geranium Detector |
|
Folder 35 |
Muller Blueprints and Design Documents - Siphotodiode |
|
Folder 36 |
Muller Blueprints and Design Documents - 11B500 GE Pulser Folder 1 Hardware |
|
Folder 37 |
Muller Blueprints and Design Documents - 11B500 Drawings of 2.3m Telescope Base at Siding Spring / Mt. Stromlo / From John Hart |
|
Folder 38 |
Muller Blueprints and Design Documents -11B500 Ge Detector Hardware |
|
Folder 39 |
COBE DMR Pipeline - Logbooks, Jon Aymon, 1985-1990 |
Box 5 |
Folder 1 |
COBE Memo Index |
|
Folder 2 |
APCS COBE Blurbs |
|
Folder 3 |
COBE Newsletter, December 1978 |
|
Folder 4 |
Correspondence FYI Reports, January 23, 1979 |
|
Folder 5 |
FYI 1-001, December 21, 1978 |
|
Folder 6 |
FYI-1-002, December 21, 1978 |
|
Folder 9 |
FYI-1-09, February 16, 1979 |
|
Folder 10 |
FYI-1-10, February 21, 1979 |
|
Folder 12 |
Letters to NASA [1 Letter dated October 5, 1979], [1979] |
|
Folder 14 |
COBE Correspondence NASA HQ to LBL/SSL |
|
Folder 15 |
COBE Correspondence LBL/SSL to NASA HQ |
|
Folder 16 |
COBE Correspondence LBL/SSL to Goddard |
|
Folder 17 |
COBE Correspondence ONR to LBL/SSL |
|
Folder 18 |
COBE Correspondence Goddard to LBL/SSL |
|
Folder 19 |
COBE Correspondence Princeton to LBL/SSL |
|
Folder 20 |
COBE Correspondence JPL to LBL/SSL |
|
Folder 21 |
The Italian Connection |
|
Folder 43 |
COBE Memo 5009a - Systematic Error 8V797 |
|
Folder 62 |
COBE Memo 5032 [Pointing] |
|
Folder 64 |
COBE Memo 5050 (469) |
|
Folder 75 |
Sensitivity to Opening Angles [COBE Memo 5029] |
Box 6 |
Folder 1 |
Spherical Harmonics |
|
Folder 2 |
Letters and Memos to Project, [1981-1989] |
|
Folder 3 |
Dick Weber, [1980-1987] |
|
Folder 5 |
CCRs [Configuration Change Request] |
|
Folder 7 |
Letters to COBE People |
|
Folder 10 |
COBE DMR Thermal Requirements |
|
Folder 12 |
Calibrators, DMR |
|
Folder 13 |
Thermal Analysis |
|
Folder 14 |
John Mather, [1982-1988] |
|
Folder 16 |
Goddard Horn Patterns |
|
Folder 17 |
Magnetic Effect |
|
Folder 19 |
DMR Cooled Receivers |
|
Folder 20 |
STM Microphonic Test |
|
Folder 21 |
Pattern Measurements of a Low-Sidelobe Horn Antenna |
|
Folder 22 |
System Specifications |
|
Folder 2 |
Measurement of Reflection and Emission from Styrofoam - Kaplan Antenna Covers |
|
Folder 3 |
DMR Shield / Sidelobes |
|
Folder 4 |
DMR FIRAS Interference |
|
Folder 5 |
Data Electronics Unit Dev. |
|
Folder 7 |
DMR Telemetry Displays / IGSE Software |
|
Folder 8 |
COBE Science Working Room |
|
Folder 10 |
Advanced Receivers |
|
Folder 11 |
COBE Tech. Review Response, August 1980 |
|
Folder 12 |
COBE Tech Review NASA, May 1980 |
|
Folder 13 |
COBE Tech Review, April 1980 |
|
Folder 14 |
Statements of Work |
|
Folder 15 |
COBE Team Meetings - COBE (SWG) Science Work Group |
|
Folder 16 |
COBE Meeting, March 19-20, 1981 |
|
Folder 17 |
COBE Meeting, December 11-12, 1980 |
|
Folder 18 |
COBE Meeting, July 7-8, 1990 |
|
Folder 19 |
COBE Meeting, March 27-29, 1980 |
Box 8 |
Folder 1 |
FIRAS Preliminary Design Review Vol. 1 |
|
Folder 2 |
Hinners Review [COBE Status Review to Code 100] |
|
Folder 3 |
COBE Instruments PDR Vol. II DMR, June 2-3, 1983 |
|
Folder 4 |
COBE Team Meeting, December 5-7, 1979 |
|
Folder 5 |
COBE Meeting, September 29-30, 1979 |
|
Folder 6 |
COBE Team Meeting, July 18 - 20, 1979 |
|
Folder 7 |
COBE Team Meeting, March 30-31, 1979 |
|
Folder 8 |
COBE Team Meeting, January 12-13, 1979 |
|
Folder 9 |
COBE Team Meeting, October 13-14, 1978 |
|
Folder 10 |
COBE Team Meeting, April 1978 |
|
Folder 11 |
1st, 2nd, and 3rd COBE Meetings |
|
Folder 12 |
COBE Diagrams and Instruments |
|
Folder 13 |
31.4 GHz Receiver |
|
Folder 14 |
Equipment and Parts |
|
Folder 15 |
COBE Instruments Monthly Status |
|
Folder 16 |
COBE Publications |
|
Folder 17 |
Memorandum of Understanding |
|
Folder 18 |
Cost Review Instrument |
|
Folder 19 |
Altitude Control Critical Design Review |
|
Folder 20 |
Electrical System Review |
|
Folder 21 |
Performance Spec. Revision A |
|
Folder 22 |
Cost Review Technical [HDQ Review] |
|
Folder 23 |
Twin Industries Inc. |
|
Folder 2 |
Reports and Documents - COBE Financial Management Reports |
|
Folder 3 |
Periodic Meeting Reports #1 |
|
Folder 4 |
Periodic Meeting Reports #2 |
|
Folder 5 |
Progress Reports from Goddard |
|
Folder 6 |
Engineering Monthly Reports Jan-Dec |
|
Folder 7 |
Manpower Reports |
|
Folder 8 |
COBE White Report |
|
Folder 9 |
DIRBE Monthly Report |
|
Folder 10 |
FIRAS Monthly Report |
|
Folder 11 |
Blue Team Meetings |
|
Folder 12 |
Notes and Memos |
|
Folder 13 |
UCBSSL No.636-77 Satellite Proposal |
|
Folder 14 |
Status Report for COBE, August 1, 1977 |
|
Folder 15 |
NASA COBE Continuation 81 |
|
Folder 16 |
NAS5-24105 Cumulative Report Listings, October 1977 |
|
Folder 17 |
Final Report - NAS5-24105, May 9, 1978 |
|
Folder 18 |
Contract Correspondence, NAS5-24105 (Administrative), May 9, 1978 |
|
Folder 19 |
COBE Proposal 3/81 and Modification, 1981 |
|
Folder 20 |
DIRBE and FIRAS and DMR |
Box 10 |
Folder 1 |
IDR - FIRAS |
|
Folder 2 |
DIRBE Experiment on COBE |
|
Folder 3 |
FIRAS Experiment on COBE |
|
Folder 4 |
Specifications - DMR |
|
Folder 6 |
DMR Proposal Outline |
|
Folder 7 |
Aerojet - Aerojet Budget Work - COBE |
|
Folder 8 |
COBE Correspondence LBL to Aerojet |
|
Folder 9 |
COBE Correspondence Aerojet to LBL |
|
Folder 10 |
Data Analysis - General Info |
|
Folder 11 |
Ground Support Equipment |
|
Folder 12 |
IAC Background Material |
|
Folder 14 |
JPL Data Analysis |
|
Folder 15 |
Quadrilateralized Spherical Cube Database |
|
Folder 16 |
Headquarters Review, April 1988 |
|
Folder 17 |
Astrophysics Data Operations |
|
Folder 18 |
Delta Critical Design Review |
|
Folder 21 |
Subject Report - COBE AEM-ERBS Module |
|
Folder 22 |
COBE Science Payload Evaluation Study |
|
Folder 23 |
COBE Instrument Implementation Plan |
|
Folder 24 |
Performance Assurance Requirements |
|
Folder 25 |
Budgeting and Planning - COBE Budget Estimates |
|
Folder 26 |
COBE DMR Finances |
|
Folder 27 |
COBE 533 Reports for NAS5-27592 |
|
Folder 28 |
COBE 533 Reports for NAS5-25007 |
|
Folder 29 |
COBE Study Proposal |
|
Folder 30 |
COBE Status Report for NAS5-24105 (8/1/77), August 1977 |
|
Folder 2 |
1981 Bi-Monthly Reports |
|
Folder 3 |
1980 Bi-Monthly Reports |
|
Folder 4 |
1979 Bi-Monthly Reports |
|
Folder 5 |
1978 Bi-Monthly Reports |
|
Folder 6 |
COBE 25007 Reports - COBE (NAS5-25007) Monthly Report Covers |
|
Folder 7 |
COBE Monthly Report, March 1978 |
|
Folder 8 |
COBE Monthly Report, May 1978 |
|
Folder 9 |
COBE Monthly Report, July 1978 |
|
Folder 10 |
COBE Monthly Report, September 1978 |
|
Folder 11 |
COBE Monthly Report, November 1978 |
|
Folder 12 |
COBE Monthly Report, January 1979 |
|
Folder 13 |
COBE Monthly Report, March 1979 |
|
Folder 14 |
COBE Monthly Report, May 1979 |
|
Folder 15 |
COBE Monthly Report, July 1979 |
|
Folder 16 |
COBE Monthly Report, September 1979 |
|
Folder 17 |
COBE Monthly Report, November 1979, March 1980 |
|
Folder 18 |
Statement of Work |
|
Folder 19 |
Report Guidelines |
|
Folder 20 |
PI's Responsibilities |
|
Folder 21 |
Program Plan, Final, 1978-1979 |
|
Folder 22 |
Final COBE, 1978-1979 |
|
Folder 23 |
COBE Final Report, 1980 |
|
Folder 24 |
COBE Final Report, 1981 |
|
Folder 25 |
COBE Final Report, 1978-1983 |
|
Folder 26 |
Program Plan, Drafts and Materials |
|
Folder 28 |
Administrative Correspondence NAS5-25007 |
|
Folder 29 |
Proposal, Contract and Associated Stuff - Proposal to NASA 1/25/78 which became NAS5-25007, 1978-1979 |
|
Folder 30 |
COBE Continuation Proposal, January 1980 |
|
Folder 31 |
Contract, NASA #: NAS5-25007, March 1, 1978 |
|
Folder 32 |
Contract Modifications |
|
Folder 33 |
Statement of Work, November 11, 1977 |
|
Folder 34 |
Administrative Correspondence NAS5-25007 |
|
Folder 35 |
Cumulative Reports NAS5-25007 |
|
Folder 36 |
Cumulative Reports NAS5-25007 Smoot |
|
Folder 37 |
COBE Overview, 1980 |
|
Folder 38 |
Cumulative Reports NAS5-27592 Smoot |
|
Folder 39 |
Administrative Correspondence NAS5-27592 Smoot |
Box 12 |
Folder 1 |
IDSP GSFC 1982 rev. 1984 |
|
Folder 2 |
CSC Report on COBE data Management |
|
Folder 3 |
CSC COBE Data Processing |
|
Folder 4 |
COBE IGSE Capabilities |
|
Folder 5 |
ECIL CSC, May 1978 |
|
Folder 6 |
COBE System Concept Review Science Data Room Science Working Group Responsibilities, January 25, 1985 |
|
Folder 7 |
COBE Instruments [DMR CDSR, Science Processing Design, Data Sets for FIRAS, DIRBE, DMR, Data Dictionary] |
|
Folder 8 |
COBE Instruments [IGSE, STOL Capabilities] |
|
Folder 9 |
COBE Instruments [Observability] |
|
Folder 10 |
COBE Instruments [COBE Coordinate Systems Definition, Fluctuations Observability, Data Reduction, Operations Concept, DMR Instrument Definition Report, Statement of Work …] |
|
Folder 11 |
COBE Instruments [Walsh Transforms, COBE Memos, Data Processes, FIRAS and DMR Software] |
|
Folder 12 |
COBE Instruments [CDSR Science Working Group - SWG] |
|
Folder 13 |
COBE Instruments [SWG, DMR Mid-Term Test Review] |
|
Folder 14 |
COBE Instruments [DIRBE Stray Light Analysis, CSDR Preliminary Design Review] |
|
Folder 15 |
COBE Instruments [Instrument Definition Report for DMR] |
|
Folder 16 |
COBE Instruments [Instrument Definition Report - Isotropy Instrument - DMR] |
|
Folder 17 |
COBE Instruments [Instruments Flight Performance Requirements, Systems Requirements] |
|
Folder 18 |
COBE Instruments [SWG, Project Status Review, Calibration Report, Fracture Control Panel, Microphonics] |
|
Folder 19 |
COBE Instruments [SWG Meeting Notes, Microphonics, Accelerated Schedule Proposal, Calibration Data Sets, Instruments Development] |
Box 13 |
Folder 1 |
COBE Instruments [Instrument Definition Report for DIRBE, COBE PER Instruments, COBE/Delta OMNI Deployment Mechanism] |
|
Folder 2 |
COBE Instruments [Pre-Integration Review - DMR, GSFC Specification, DMR Interface Control Document, Performance Verification Matrix] |
|
Folder 3 |
COBE Instruments [PDR Vol. III : DIRBE, June 6-7, 1983 |
|
Folder 4 |
COBE Instruments [DMR Monthly from GFSC] |
|
Folder 5 |
COBE Instruments [Execution Phase Project Plan, COBE FIRAS SWG, DMC Moon Calibration, IRAS Lessons Learned, Performance Specification, Program Requirements and Design Guidelines for DIRBE] |
|
Folder 6 |
COBE Instruments [Execution Phase Project Plan, Verification Specification, Fracture Control Plan, Minutes COBE Phase I and DEWAR Phase II Safety Review] |
|
Folder 7 |
COBE Instruments [COBE Concepts Review, Minutes from Phase 0 Safety Review, Biannual Review] |
|
Folder 8 |
COBE Instruments [Fracture Control Plan, FIRAS Interface Control Document] |
|
Folder 9 |
COBE Instruments [Pre-Environmental Review Vol. 1] |
|
Folder 10 |
COBE Instruments [Pre-Environmental Review Vol. 2] |
|
Folder 11 |
COBE Instruments [Critical Design Review Vol. 1] |
|
Folder 12 |
COBE Instruments [Critical Design Review Vol. II] |
|
Folder 13 |
COBE Instruments [Critical Design Review Vol. III] |
|
Folder 14 |
COBE Instruments [DMR Subsystem Software, CSDR Data Management, CSDR News Bulletins, GDS - Spacecraft Database Status] |
|
Folder 15 |
COBE Instruments [Mission Operations and Command Verification, Mission Planning Tools, Coordinate Definitions, Attitude Control, DMR Diagnostics, RIDs from CSDR CDR] |
|
Folder 16 |
COBE Instruments [CSDR CDR Review, Operations and Data Analysis Requirements - SWG, GSFC Specification for DMR, FIRAS Enquirer, SWG Pipeline Test, Delta Axes and Orientation] |
|
Folder 17 |
COBE Instruments [CSDR CDR RID Responses, FIRAS SWG Pipeline, data Management Subsystem Build 1, Minutes - Attitude Requirements Meeting, Delta CDR, Validation Plan] |
Box 14 |
Folder 1 |
COBE Instruments [SWG Project Pipeline Tests, Software Development, CSDR, IGSE, Mission Planning, and Operations, CAC Operations Agreement] |
|
Folder 2 |
COBE Bi-Monthly Report |
|
Folder 3 |
George [Bi-Monthly Progress Report] |
|
Folder 4 |
Scott [Bi-Monthly Progress Report] |
|
Folder 5 |
Phil [Bi-Monthly Progress Report] |
|
Folder 6 |
Chris [Bi-Monthly Progress Report] |
|
Folder 7 |
Steven [Bi-Monthly Progress Report] |
|
Folder 8 |
Reports and Timetables |
|
Folder 9 |
COBE General Info |
|
Folder 10 |
Preparation for Bi-Monthly Report for Months of January-February, 1980 |
|
Folder 11 |
COBE Monthly Report |
|
Folder 12 |
Design Proposal - COBE |
|
Folder 13 |
Design Proposal - Goddard Briefing, April 28, 1975 |
|
Folder 14 |
COBE Design Proposal, 1978 |
|
Folder 15 |
Design Proposal - COBE SRT Proposal |
|
Folder 16 |
3 K Anistropy Satellite Proposal |
|
Folder 17 |
Design Proposal - Cosmic Microwave Experiment Proposal, 1976 |
|
Folder 18 |
Design Proposal - Goddard, MIT Princeton [Cosmological Background Radiation Satellite], [October 1974] |
|
Folder 19 |
Design Proposal - [Ball Brothers, Boeing] |
|
Folder 20 |
Design Proposal - [Feasibility Study of the Boeing Small Reasearch Module] |
|
Folder 21 |
Design Proposal [Small Research Module Auroral Satellite] |
|
Folder 22 |
Design Proposal - [Satellite Calculations] |
|
Folder 23 |
Design Proposal [Heat Capacity Mapping Mission] |
|
Folder 24 |
Design Proposal - [NASA, Lockheed Martin] |
|
Folder 25 |
Design Proposal - Scout |
|
Folder 26 |
Design Proposal - IRAS |
Box 15 |
Folder 1 |
Design Proposal - AO #6 and 7 |
|
Folder 2 |
Design Proposal - Miscellaneous Drawings |
|
Folder 3 |
3 K Isotropy Experiment Satellite Proposal |
|
Folder 4 |
Satellite Management Section |
|
Folder 5 |
Specifications - Biannual Review, June 1984 |
|
Folder 6 |
Far Infrared Absolute Spectrophotometer (FIRAS) Preliminary Performance Specification and Flight Subsystem Design |
|
Folder 7 |
Specifications - COBE DMR Interface Control Document |
|
Folder 8 |
Specifications - COBE Thermal Specifications |
|
Folder 9 |
Specifications - Spacecraft Observation Preliminary Design Review |
|
Folder 10 |
COBE Third Quarterly Meeting, 1983 |
|
Folder 11 |
Specifications - COBE Electrical Systems Design Handbook |
|
Folder 12 |
On Orbit Attitude Control of COBE |
|
Folder 13 |
Phase 0, 1 Safety Review COBE, 1982 and 1985 |
|
Folder 14 |
Specifications - Configuration Management Plan |
|
Folder 15 |
Specifications - Dicke Switch - Critical Design Review |
|
Folder 16 |
Equipment and Software Data Processing |
|
Folder 17 |
Missing Operations Planning Review |
|
Folder 18 |
Mission Phase Power Status Summaries |
|
Folder 19 |
Dollar / Schedule / Manpower Report |
|
Folder 20 |
Payload Operations Prelim Design Review |
Box 16 |
Folder 1 |
Support Instrumentation Requirements |
|
Folder 2 |
Sun Shade Mission Analysis, 1983 |
|
Folder 3 |
System Safety Plan, 1982 |
|
Folder 4 |
Dewar System Specifications |
|
Folder 5 |
Preliminary Ground System Scenario |
|
Folder 6 |
Structural, Thermal, Power Summaries |
|
Folder 7 |
COBE Project Start |
|
Folder 9 |
COBE Periodic Meetings |
|
Folder 10 |
DMR System Concept |
|
Folder 11 |
Instruments Development Plan |
|
Folder 12 |
System Concept Review Project Response |
|
Folder 13 |
System Concept Review Problem Report |
|
Folder 14 |
Data Analysis and GSE Documents and Software |
|
Folder 15 |
Science Data Analysis Software Documentation Vol. 2 |
|
Folder 16 |
Science Data Analysis Software Prelim Review |
|
Folder 17 |
Instrument Ground Support Equipment |
|
Folder 18 |
Science Working Group |
|
Folder 19 |
Failure Mode Effects and Criticality Analysis |
|
Folder 20 |
System Concept Review |
|
Folder 21 |
COBE Blue Team Review, May 5-8, 1981 |
|
Folder 22 |
DMR Systematic Error Review, December 17, 1991 |
|
Folder 23 |
DMR Software Guide, December 1991 |
|
Folder 24 |
CSDR Hitchhiker's Guide Draft, August 1988 |
|
Folder 25 |
COBE Science Data Room System Test Plan Revision 1.0, June 1988 |
|
Folder 26 |
NASA Headquarters COBE Technical and Cost Review, July 21, 1981 |
|
Folder 27 |
COBE Data Analysis Algorithms |
Box 17 |
Folder 1 |
COBE - General Info [Overview, Schedule, Newsletter, DMR Status] |
|
Folder 2 |
COBE Performance Specification for a Delta Launch |
|
Folder 3 |
Gain Stability Support |
|
Folder 4 |
Computer Program for Diode Detector Linearity Evaluation - COBE Note DMR 016 |
|
Folder 5 |
Microwave Antenna Analysis Reports |
|
Folder 6 |
Prelim Thermal Analysis for DMR Thermal Balance Unit |
|
Folder 7 |
Breadboard Test Plan |
|
Folder 8 |
COBE Instrument Technology Review |
|
Folder 9 |
Data Manage [Report Drafts, Data Requirements and Interface, Telemetry Stream, Reduction and Analysis, CSC] |
|
Folder 10 |
COBE Cost Estimates |
|
Folder 11 |
COBE Blue Team Review, May 5-8, 1981 |
|
Folder 12 |
COBE Science Data Requirements |
|
Folder 14 |
GSFC Specification for the COBE DMR |
|
Folder 15 |
DMR Proposal March 1980 |
|
Folder 17 |
Experiment Requirements Documents |
|
Folder 18 |
Miscellaneous Documents - Drawings, Document Change Log, Calibration, Observatory Magnetic Test Plan Rev. A, CSDR 30 Day Plan Preparation, Test Plan for ETU Thermal Shield Integrity Test |
|
Folder 22 |
DMR 53 Interceptor Plates |
|
Folder 23 |
DMR 53 Electronics |
Box 18 |
Folder 1 |
DMR - Electronics |
|
Folder 9 |
Mission Operations Planning Review Vol. 3, May 6-7, 1986 |
Box 19 |
Folder 1 |
DMR Verification Test Procedures - Bob Walla |
|
Folder 2 |
COBE Thermal Shield Integrity Test |
|
Folder 3 |
Mission Operations Review |
|
Folder 4 |
31 GHz Powerups COBE |
|
Folder 5 |
DMR/COBE Manuals, Explanation, Guides, Notes |
|
Folder 7 |
COBE Test Planning Meetings Minutes |
|
Folder 9 |
Noise Diode Stability from JPL Tests |
|
Folder 10 |
Final Report NSG 2125 |
|
Folder 11 |
Test Planning, Thermal Review, Post Environmental Review |
|
Folder 12 |
PERT, Budget Plan, SWG |
|
Folder 13 |
Miscellaneous Technical Documents and Photos |
|
Folder 14 |
Miscellaneous Technical Documents and Photos (part 2) |
Box 20 |
Folder 1 |
SWG Meetings, July 13-14, 1992 |
|
Folder 4 |
DMR Vugraphs SWG, July 18, 1991 |
|
Folder 5 |
DMR Processing Diagram, IGSE Papers in Progress |
|
Folder 6 |
Graphs, Memos, Correspondence, Meeting Minutes |
|
Folder 7 |
Status Report on DIRBE, COBE Extended Mission, DIRBE Report to SWG, DMR Status, 1991 |
|
Folder 8 |
Anistropy Levels, Graphs, SWG Meetings, Anistropy Satellite, FIRAS |
|
Folder 9 |
Anistropy, DIRBE and DMR Sky Maps |
|
Folder 10 |
Graphs, DMR Post Regulators, COBE Thermal/RF Shield Requirements, COBE Coordinate Systems Definition, Execution Phase Project Plan, DMR Flight Telemetry and Control Temperature Sensors Installation Procedure, ESD Tests, Report to SWG |
|
Folder 11 |
Plots, Calibration, DMR Daily Quality Check |
|
Folder 14 |
Graphs, DMR Software Meeting, DIRBE SWG Meeting |
|
Folder 15 |
Other ISO Materials Calculations etc. |
|
Folder 16 |
Physics [GSFC Specification, Verification Plan for DMR] |
|
Folder 17 |
Proposal - Infrared Space Observatory |
|
Folder 18 |
DIRBE Absolute Calibration |
|
Folder 19 |
IGSE Documentation |
|
Folder 20 |
Mission Operations Planning Review Vol. 1, May 6-7, 1986 |
|
Folder 21 |
Preliminary Design Review CSDR, Day One, February 27-28, 1986 |
|
Folder 22 |
Preliminary Design Review CSDR, Day Two, February 27-28, 1986 |
|
Folder 23 |
Science Working Group - Operations and data Analysis Requirements, February 10, 1986 |
|
Folder 25 |
CSDR Instruments |
|
Folder 26 |
SWG Meeting Agenda |
|
Folder 27 |
DIRBE Infrared Observations of the Ecliptic Poles |
|
Folder 28 |
GSFC Specifications for DMR Rev. A |
|
Folder 29 |
FIRAS External Calibrator |
|
Folder 30 |
COBE Project Directory and GSFC Directories |
|
Folder 31 |
SWG Meeting Agenda, 1993 |
|
Folder 32 |
DMR Software Guide, December 1991 |
|
Folder 33 |
FIRAS Status, May 22, 1993 |
|
Folder 34 |
DIRBE Schedule of Primary Events |
|
Folder 35 |
Proposed DIRBE Software Enhancements |
Box 21 |
Folder 1 |
Temporary Special Use Permit / Transporting Equipment through Yosemite |
|
Folder 2 |
Ned Wright's Library COBLIB.LIS (July 9, 1985), Superceded (10/15/85), 1985 |
|
Folder 4 |
COBE Project Objectives and General Description, 1984 |
|
Folder 7 |
CSDR Database Manual |
Box 22 |
Folder 1 |
4192 05 SKYQO WITEBSKY Film Comix 1 November 83 2 November 83 13.34 [Microfilm], November 1983 |
|
Folder 2 |
4192 05 DECFI02 LUBIN OUT1 09 Jul 82 12 Jul 82 09.45 02.25 8 FRN [Microfilm], July 1982 |
|
Folder 3 |
4190 05 ATTEN19 FILM35 COMIX AYMONG 02 Jun 79 04 Jun 79 PLOT 15.53 03.51 6 FRM [Microfilm], June 1979 |
|
Folder 4 |
Astrophysics U2 Microfiche |
|
Folder 5 |
To 6/24/77 [Microfiche], June 1977 |